Survey topic construction survey

Setting out of building (rough measure) be-
vore the digging in order to mark the cor-
ners of the projected house in the location
with wooden poles (Precision: decimeter).
At this point of time also takes place the
setting of the elevation above sea-level of
the projected building (ground floor).

Setting out of building (exact measure) after
the digging unto the scaffold-of-cords in the
ditch of the construction-site (Precision : 0,3
centimeter). Field-sketch and certification.